Residential and commercial strip-outs
Internal demolition and removal
What is a strip out?
A strip out is the removal of internal parts of a building while keeping the main structure in place. It is often completed before renovations, commercial upgrades, tenancy changes, or full demolition.
The work can involve removing internal walls, ceilings, flooring, kitchens, bathrooms, joinery, services, fittings, and waste materials. The goal is to leave a clear and safe space for builders, trades, or the next stage of the project.
When Strip Outs are Needed
Strip outs are useful when a building needs to be updated but does not need to be completely demolished. They are common in older homes, shops, offices, restaurants, warehouses, and commercial tenancies.
You may need a strip out if you are:
Starting with a professional strip out can make later work easier. It gives builders a cleaner space to work in and exposes issues that need attention before continuing renovation.
Our Strip Out Service
Ulladulla Demolition can complete strip-outs for small residential jobs through to larger commercial and industrial spaces. We plan the work around the property, access, safety requirements, and the condition of the materials being removed.
Our strip-out services can include:

Removal of internal walls, ceilings, and partitions

Removal of kitchens, bathrooms, cabinets, and joinery

Lifting and removal of flooring, tiles, carpet, and wall coverings

Removal of old fixtures, fittings, and non-structural elements

Removal of shop fittings, office furniture, shelving, and counters

Clearing of waste, debris, and unwanted materials

Separation of materials for recycling and disposal where possible

Final clean-up and preparation for the next stage of work
Every project is different. We provide a clear scope based on what needs to be removed and what needs to remain in place.
Residential strip outs
A residential strip out is often the first step in a home renovation. It allows old or damaged materials to be removed before new rooms, layouts, finishes, or services are installed.
We can help prepare houses, units, apartments, garages, and outbuildings for renovation. This may include removing kitchens, bathrooms, internal linings, flooring, built-in furniture, and non-load-bearing walls.
A strip out can also help uncover hidden issues such as water damage, old services, damaged framing, or asbestos-containing materials. Finding these early can help avoid delays once renovation work begins.
Commercial strip outs
Commercial strip outs help businesses, landlords, property managers, and builders prepare a space for a new use. This could involve clearing out the space before a new tenant moves in or clearing a property before refurbishment.
We work on commercial spaces such as:
Commercial work often needs to be planned around access, neighbouring tenants, building rules, and project deadlines. We work with site managers and other trades to keep the strip out organised and minimise disruption where possible.
What Can Strip Outs Remove?
The materials removed during a strip out depend on the building and the planned works. Some projects only need a kitchen or bathroom removed, while others require the full internal space to be cleared back to the main structure.
Common strip-out items include:
Before work begins, we confirm what will be removed and what must stay protected. This is important where parts of the building will remain in use or where services need to be kept in place.
Our strip out process
A well-planned strip out helps protect the parts of the property that are staying while making room for the next stage of work. We assess the site before starting and plan the job around the layout, access, materials, and project needs.
Our process usually includes:
Site inspection and planning
We inspect the property, discuss the required work, and identify access, safety, and protection requirements.
Identifying materials and hazards
We check for issues such as asbestos, damaged materials, or services that need to be cleared before removal starts.
Protection and preparation
Areas that are being left alone are protected, and the work area is prepared for a safe strip out.
Internal removal works
We remove the agreed fixtures, fittings, linings, flooring, partitions, and waste materials.
Waste removal and disposal
Materials are sorted where practical, loaded, removed from site, and taken to suitable disposal or recycling facilities.
Final clean-up
Once the strip out is complete, the work area is cleared and ready for builders, trades, refurbishment, or demolition.
Asbestos and Hazardous Materials
Older properties may contain asbestos in areas such as wall linings, ceilings, flooring, eaves, service areas, roofing, or external cladding. It is important to identify suspected asbestos before a strip-out begins, as cutting, drilling, sanding, or breaking asbestos-containing materials can create a health risk.
If asbestos or another hazardous material is suspected, it should be assessed before removal work starts. Ulladulla Demolition can coordinate the right removal process so the project can continue safely and with less risk of disruption.
Why choose Ulladulla Demolition?
Strip outs require careful work, especially when parts of the building need to remain undamaged. You need a contractor who can remove the right materials, manage waste properly, and leave the space ready for the next trade.
Clients choose Ulladulla Demolition because we provide:
Strip Cut Costs in Ulladulla
The cost of a strip out depends on the size of the property, the amount of material to be removed, site access, waste volume, and whether asbestos or other hazards are present.
A small bathroom or kitchen strip out will have different requirements from clearing a full commercial tenancy or large home. We inspect the site and discuss the required work so we can provide a clear quote based on the actual scope.